Fiscal year 2026 · Ministry of Public Works

258 projects,each with a place on it.

Where it is being built

Lanao del Sur₱1,404,010,000.00 · 86

Lanao del Sur

86

Lanao del Sur: ₱1,404,010,000.00, 86 projects.

Maguindanao del Sur₱760,390,000.00 · 36

Maguindanao del Sur

36

Maguindanao del Sur: ₱760,390,000.00, 36 projects.

Maguindanao del Norte₱652,520,000.00 · 29

Maguindanao del Norte

29

Maguindanao del Norte: ₱652,520,000.00, 29 projects.

Tawi-Tawi₱648,680,000.00 · 36

Tawi-Tawi

36

Tawi-Tawi: ₱648,680,000.00, 36 projects.

Basilan₱627,650,000.00 · 37

Basilan

37

Basilan: ₱627,650,000.00, 37 projects.

Special Geographic Area₱469,100,000.00 · 18

Special Geographic Area

18

Special Geographic Area: ₱469,100,000.00, 18 projects.

Cotabato City₱205,510,000.00 · 16

Cotabato City

16

Cotabato City: ₱205,510,000.00, 16 projects.

Where it is being built. Every project is listed under exactly one area, so these 7 shares are the ₱4.8 billion divided between them and nothing is counted twice. Lanao del Sur takes 29.4% of it — ₱1.4 billion over 86 projects, which is 33% of everything the Act itemises and 6.8 times what Cotabato City is given.

What is being built

Road₱2,935,810,000.00 · 142

Road

142

Road: ₱2,935,810,000.00, 142 projects.

Flood Control / Drainage₱1,009,710,000.00 · 56

Flood Control / Drainage

56

Flood Control / Drainage: ₱1,009,710,000.00, 56 projects.

Bridge₱530,790,000.00 · 31

Bridge

31

Bridge: ₱530,790,000.00, 31 projects.

Building / Facility₱316,400,000.00 · 11

Building / Facility

11

Building / Facility: ₱316,400,000.00, 11 projects.

Other Infrastructure₱287,470,000.00 · 16

Other Infrastructure

16

Other Infrastructure: ₱287,470,000.00, 16 projects.

Electrification / Lighting₱227,700,000.00 · 21

Electrification / Lighting

21

Electrification / Lighting: ₱227,700,000.00, 21 projects.

Water System₱116,280,000.00 · 21

Water System

21

Water System: ₱116,280,000.00, 21 projects.

Port / Wharf₱2,510,000.00 · 1

Port / Wharf

1

Port / Wharf: ₱2,510,000.00, 1 projects.

What is being built. Mostly this money is roads: 142 of the 258 projects and ₱2.9 billion, against ₱1 billion across 56 for flood control / drainage. But 41 projects are two things at once — a road with a bridge on it is both — so unlike the areas these columns overlap: they come to ₱5.4 billion, 13.8% more than the projects actually cost.

Loading 258 projects…

Every project on this page from Bangsamoro Autonomy Act No. 85 — General Appropriations Act of the Bangsamoro, FY 2026, pages 136–150 as printed. How this was compiled

Get involved

Public records get betterwhen people check them.

Spotted an error, or have a document worth adding? Every correction and every source makes the record stronger — and the official source is always right where we are wrong.