Special Geographic Area · Flood Control / Drainage
Construction of Flood Control Structure (Phase 3), Brgy. Buluan, Old Kaabakan
₱88,500,000.00
Fiscal year 2026 · Ministry of Public Works
Lanao del Sur₱1,404,010,000.00 · 86
Lanao del Sur
86
Lanao del Sur: ₱1,404,010,000.00, 86 projects.Maguindanao del Sur₱760,390,000.00 · 36
Maguindanao del Sur
36
Maguindanao del Sur: ₱760,390,000.00, 36 projects.Maguindanao del Norte₱652,520,000.00 · 29
Maguindanao del Norte
29
Maguindanao del Norte: ₱652,520,000.00, 29 projects.Tawi-Tawi₱648,680,000.00 · 36
Tawi-Tawi
36
Tawi-Tawi: ₱648,680,000.00, 36 projects.Basilan₱627,650,000.00 · 37
Basilan
37
Basilan: ₱627,650,000.00, 37 projects.Special Geographic Area₱469,100,000.00 · 18
Special Geographic Area
18
Special Geographic Area: ₱469,100,000.00, 18 projects.Cotabato City₱205,510,000.00 · 16
Cotabato City
16
Cotabato City: ₱205,510,000.00, 16 projects.Where it is being built. Every project is listed under exactly one area, so these 7 shares are the ₱4.8 billion divided between them and nothing is counted twice. Lanao del Sur takes 29.4% of it — ₱1.4 billion over 86 projects, which is 33% of everything the Act itemises and 6.8 times what Cotabato City is given.
Road₱2,935,810,000.00 · 142
Road
142
Road: ₱2,935,810,000.00, 142 projects.Flood Control / Drainage₱1,009,710,000.00 · 56
Flood Control / Drainage
56
Flood Control / Drainage: ₱1,009,710,000.00, 56 projects.Bridge₱530,790,000.00 · 31
Bridge
31
Bridge: ₱530,790,000.00, 31 projects.Building / Facility₱316,400,000.00 · 11
Building / Facility
11
Building / Facility: ₱316,400,000.00, 11 projects.Other Infrastructure₱287,470,000.00 · 16
Other Infrastructure
16
Other Infrastructure: ₱287,470,000.00, 16 projects.Electrification / Lighting₱227,700,000.00 · 21
Electrification / Lighting
21
Electrification / Lighting: ₱227,700,000.00, 21 projects.Water System₱116,280,000.00 · 21
Water System
21
Water System: ₱116,280,000.00, 21 projects.Port / Wharf₱2,510,000.00 · 1
Port / Wharf
1
Port / Wharf: ₱2,510,000.00, 1 projects.What is being built. Mostly this money is roads: 142 of the 258 projects and ₱2.9 billion, against ₱1 billion across 56 for flood control / drainage. But 41 projects are two things at once — a road with a bridge on it is both — so unlike the areas these columns overlap: they come to ₱5.4 billion, 13.8% more than the projects actually cost.
Loading 258 projects…
Every project on this page from Bangsamoro Autonomy Act No. 85 — General Appropriations Act of the Bangsamoro, FY 2026, pages 136–150 as printed. How this was compiled
Get involved
Spotted an error, or have a document worth adding? Every correction and every source makes the record stronger — and the official source is always right where we are wrong.
18 of 258 projects · ₱469,100,000.00
Special Geographic Area · Flood Control / Drainage
₱88,500,000.00
Special Geographic Area · Flood Control / Drainage
₱59,500,000.00
Special Geographic Area · Road, Flood Control / Drainage
₱34,560,000.00
Special Geographic Area · Bridge
₱30,300,000.00
Special Geographic Area · Road
₱29,100,000.00
Special Geographic Area · Road
₱27,900,000.00
Special Geographic Area · Road
₱27,300,000.00
Special Geographic Area · Road, Bridge
₱25,000,000.00
Special Geographic Area · Road
₱24,000,000.00
Special Geographic Area · Road
₱19,300,000.00
Special Geographic Area · Road
₱18,300,000.00
Special Geographic Area · Road
₱17,500,000.00
Special Geographic Area · Road
₱15,800,000.00
Special Geographic Area · Road, Flood Control / Drainage
₱14,440,000.00
Special Geographic Area · Road
₱14,000,000.00
Special Geographic Area · Road
₱10,600,000.00
Special Geographic Area · Road
₱8,800,000.00
Special Geographic Area · Road
₱4,200,000.00